Botting Botting Menu
  • HOME
  • PROJECTS
  • SERVICES
  • SAFETY
  • CAREERS
  • CONTACT US
  • 403-256-6544
  • HOME
  • PROJECTS
  • SERVICES
  • SAFETY
  • CAREERS
  • CONTACT US
  • 403-256-6544
Back to all works

West Calgary LRT

Infrastructure

Location:

Calgary, Alberta

Client:

City of Calgary

Architect:

Gibbs Gage Architects

Mechanical Engineers:

SNC Lavalin – Wiebe Forest Engineering

General Contractor:

CANA Construction Ltd.

Highlights

Westbrook Station is an underground LRT station located between Bow Trail and 17 Avenue just west of 33 Street S.W. It contains:

  • Two ground level station heads
  • An office building that consists of three parkade levels and a four storey tower

Sunalta Station is located on the south side of the CP Rail line. Highlights of the Sunalta Station area include:

  • The plaza area
  • Mezzanine level that will connect to future development
  • Bridge connection to the Greyhound Bus Station

    Your Name (required)

    Your Email (required)

    Subject

    Your Message

    Main Address


    Suite 107, 3445 114 Avenue SE.
    Calgary, Alberta, T2Z 0K6
    Phone: 403-256-6544
    Fax: 403-256-7039

    ©2018 Botting Group - All Rights Reserved Video | Digital | Social