Highlights
- The new Pandemic Response Unit at the South Health Campus includes the fit out of the level three ICU Tower and level six of the clinic block.
- Each area has approximately 95 beds, nursing stations, support rooms, washroom facilities and staff areas
- Botting completed the mechanical scope over a month long construction schedule, working during evening shifts and weekends so the spaces could be turned back over to the clinics for their normal working hours.
- The mechanical portion consists of medical gas, domestic water, sanitary, natural gas and air distribution systems.