Highlights
After the June 2013 floods in Calgary, the Saddledome required complete restoration of mechanical systems within the event level of the building.
- Botting completed the mechanical rebuild of the HVAC, chiller plant, boiler plant, rink refrigeration plant, main kitchen, washrooms, and all other systems that were housed or serviced on the event level
- Managed a mechanical workforce of over 80 tradespeople
- Botting was able to complete the restoration in less than 69 days