Saddledome Retrofit

Commercial

(Flood Restoration)

botting-red-rule

Location:

Calgary, Alberta

Client:

Calgary Flames

Architect:

Graham McCourt Architects

Mechanical Engineers:

SNC Lavalin – Wiebe Forest Engineering

General Contractor:

CANA

Highlights

botting-red-rule

After the June 2013 floods in Calgary, the Saddledome required complete restoration of mechanical systems within the event level of the building.

  • Botting completed the mechanical rebuild of the HVAC, chiller plant, boiler plant, rink refrigeration plant, main kitchen, washrooms, and all other systems that were housed or serviced on the event level
  • Managed a mechanical workforce of over 80 tradespeople
  • Botting was able to complete the restoration in less than 69 days

    Your Name (required)

    Your Email (required)

    Subject

    Your Message

    Main Address


    Suite 107, 3445 114 Avenue SE.
    Calgary, Alberta, T2Z 0K6
    Phone: 403-256-6544
    Fax: 403-256-7039

    ©2018 Botting Group - All Rights Reserved Video | Digital | Social