
Highlights
- The new Fire Station #5 is 14,000 SQFT and includes an apparatus bay for emergency vehicles, support spaces, bunk rooms, training spaces, washrooms, mechanical rooms and a fitness area.
- This facility was constructed to meet Lethbridge’s ever expanding west side.
- Botting completed the mechanical scope over a 10 month duration.
- The mechanical portion consists of a air scrubbing system, hydronic system for perimeter heating, domestic water, sanitary, natural gas and air distribution systems.