
Highlights
- New facility boasts 354,000 SQFT, processing 735 million pounds of potato’s annually.
- Botting installed over 82,000 feet of pipe in a 16 month time frame.
- Systems consisted of welded stainless steel process drainage, PVC underground sanitary drainage, welded stainless steel process systems, Type L copper domestic water systems, PVC XFR rainwater collection systems and various HVAC sheet metal scopes.
- At the peak of the project, Botting had over 60 plumbers, 13 welders and six sheet metal workers onsite