- Rockyview Surgical Centre is a clinic equipped with three operating rooms. Botting completed a renovation on a fast tracked schedule to add a medical device reprocessing area, patient recovery area, and associated humidification and air handling unit replacements for the operating rooms.
- The project included the addition of a new reverse osmosis system and an expansion of the medical gas room and the associated system. Our team completed the mechanical installation within the tight timeline the client required while working through the difficulties that come with a complex renovation inside an existing clinical space.

Highlights
![]()
- The Esports Arena at Bow Valley College is Calgary’s first Esports Arena. The much anticipated 70-seat arena will be a new hub for competition, innovation, and game development. The space features 40 competition ready gaming stations, two full motion-rigged racing simulators, a state-of-the-art broadcast suite, and a dedicated varsity esports training room.
- Botting completed the mechanical scope on a fast-tracked schedule in order to meet the aggressive opening date set by the college. We worked with the engineers and suppliers on alternate equipment options that would satisfy the specifications and enable us to meet the tight schedule.
- Mechanical highlights include running new chilled water mains through the floor below to enable the 11 new fan coil units to provide the 30 tons of cooling required to keep the gaming equipment and lighting operating, and the occupants comfortable. Trench fan coils were installed in a new raised floor around the perimeter glass. There were stringent acoustical requirements for the new space which required close coordination onsite to sure our installation was completed correctly.

Highlights
![]()
- The new Pandemic Response Unit at the South Health Campus includes the fit out of the level three ICU Tower and level six of the clinic block.
- Each area has approximately 95 beds, nursing stations, support rooms, washroom facilities and staff areas
- Botting completed the mechanical scope over a month long construction schedule, working during evening shifts and weekends so the spaces could be turned back over to the clinics for their normal working hours.
- The mechanical portion consists of medical gas, domestic water, sanitary, natural gas and air distribution systems.